Harden more miles, sooner.

Insulate your highest-risk circuits in place, in days per mile, with no planned outage.

Another option on the hardening menu.

Undergrounding and covered conductor are proven but costly and slow. Witching Hour complements these methods by tackling the miles that would otherwise wait: where budget, terrain, pole condition or permitting stand in the way.

Undergrounding

Removes the most risk, but it is the slowest and most expensive mile: trenching, permits across properties and a planned outage to cut over.

Covered conductor

Proven and widely used, but it means new conductor, a planned outage for the changeover, and new poles and crossarms where the heavier wire needs them.

Witching Hour

Insulates the existing conductor in place, in days per mile and without a planned outage. It needs no new poles or permits.

Remaining ignition riskYearsConventionalhardening aloneWith Witching HourRisk boughtdown sooner

Buy down risk now.

The same budget buys down more risk sooner, which buys time for the larger hardening projects in your wildfire mitigation plan.

What a pilot on your system looks like.

1

Select circuits

Choose the circuits to harden first.

2

Install

Energized work, span by span, with your line crew.

3

Review

Close-out report with per-span records and photos, and a plan for the next phase.

4

Scale up

Commercial deployment priced per wire-mile and delivered as a service.

Witching Hour provides
Your team provides

Line-crawling robots

Ride the energized conductor span by span, building the insulation system as they go.

Insulation system

Durable, weatherproof insulation built on the existing conductor.

Field van

The van brings the robots and insulation to the circuit. The crew works span by span and keeps daily installation records.

Line crew and bucket truck

A line crew mounts the robots at the pole and recovers them at the next, under your work rules, while the line stays energized.

Robotic wildfire hardening for the grid

Contact us about a pilot