Insulate your highest-risk circuits in place, in days per mile, with no planned outage.
Undergrounding and covered conductor are proven but costly and slow. Witching Hour complements these methods by tackling the miles that would otherwise wait: where budget, terrain, pole condition or permitting stand in the way.
Removes the most risk, but it is the slowest and most expensive mile: trenching, permits across properties and a planned outage to cut over.
Proven and widely used, but it means new conductor, a planned outage for the changeover, and new poles and crossarms where the heavier wire needs them.
Insulates the existing conductor in place, in days per mile and without a planned outage. It needs no new poles or permits.
The same budget buys down more risk sooner, which buys time for the larger hardening projects in your wildfire mitigation plan.
Choose the circuits to harden first.
Energized work, span by span, with your line crew.
Close-out report with per-span records and photos, and a plan for the next phase.
Commercial deployment priced per wire-mile and delivered as a service.
Ride the energized conductor span by span, building the insulation system as they go.
Durable, weatherproof insulation built on the existing conductor.
The van brings the robots and insulation to the circuit. The crew works span by span and keeps daily installation records.
A line crew mounts the robots at the pole and recovers them at the next, under your work rules, while the line stays energized.